291. Error Correction:
A narrow minded approach, on the other hand, is an precursor to economic and social decay.
Answer: on the other hand, is a
Explanation:Here is no explanation for this answer
Workspace
iGate
292. Select a suitable figure from the four alternatives that would complete the figure matrix.
Answer: 3
Explanation:The second figure is a part of the first figure (but is not exactly the same as the first figure).
Workspace
iGate Capgemini
293. Select a figure from amongst the Answer Figures which will continue the same series as established by the five Problem Figures.
Answer: 4
Explanation:In each step, the first element moves to the third position and gets replaced by a new element; the second and the third elements move to the first and the second positions respectively and the entire figure rotates 90CW.
Workspace
iGate
294. What is the next logical image in the sequence?
Answer: F
Explanation:Here is no explanation for this answer
Workspace
iGate
295. Series completion:
4, 7, 26, 10, 13, 2016, ?
Answer: 1914
Explanation:Here is no explanation for this answer
Workspace
iGate
296. Series completion:
1114, 14.17, 1720, 20, ?
Answer: 2323
Explanation:Here is no explanation for this answer
Workspace
iGate
297. 4,2,3,7.5,26.25,_,_
Find the next two numbers.
Answer: 649.68
Explanation:(4/2)*1=2
(2/2)*3=3
(3/2)*5=7.5
(7.5/2)*7=26.25
(26.25/2)*9=118.125
(118.123/2)*11=649.6875
Workspace
iGate
298. Which one of the following four addresses is NOT EXACTLY the same as the one given below?
Painting and Pressure Washing 7816 Asheville Hwy Spartanburg, SC 29303 (864)205-3016
(i) Painting and Pressure Washing 7816 Asheville Hwy Spartanburg, SC 29303 (864) 205-3016
(ii) Painting and Pressure Washing 7816 Asheville Hwy Spartanburg, SC 29303 (864)205-3016
(iii) Painting and Pressure Washing 7816 Asheville Hwy Spartanburg, SC 29303 (864)205-3016
(iv) Painting and Pressure Washing 7816 Ashevile Hwy Spartanbarg, SC 29303 (864)205-3016
Answer: iv
Explanation:Here is no explanation for this answer
Workspace
iGate
299. Study the table given below and answer the questions: (Consider approximate values for answers)
For which product, will the percentage of increase in requirement of liquid material be the highest over the period 1995 -1999?
Answer: Item I
Explanation:35) % increase of Item I => (1502-1100)/1502 * 100 = 26%
% increase of Item I => (1482-1109)/1482 * 100 = 25%
% increase of Item I => (1010-1110)/1110 * 100 = 9%
% increase of Item I => (1470-1140)/1470 * 100 = 22%
Highest is Item I ie 26%
Workspace
iGate
300. The requirement of which product has shown the highest change in a particular year over the previous year?
Answer: Item I
Explanation:Here is no explanation for this answer
Workspace
iGate