Quantitative Aptitude :: Time and Work - Discussion
Home > Quantitative Aptitude > Time and Work > MCQs Questions Discussion
171 / 100
Choose the correct option.
There are 3 trucks A,B and C. A loads at the rate of 10kg/min and B loads at the rate of 13 1/3 kg/min. C unloads at the rate of 5kg/min. If all the 3 trucks are acting simultaneously, find the time taken to load 2.4 tonnes.
A120.81min
B130.91min
C240 min
D100min
Answer: Option (Login/Signup)
Show Explanation
Asked In ::
No Discussion on this question yet!